background background
ROUTE FILTER
Select your departure and/or destination
for live departure and arrival boards
and filtered train disruption information.
From Switch Stations
To
Filter incidents and timetables by the from and to stations you have selected
Save Your Current Route
Saved Routes
Save the selected route so you can revisit it quickly
Delete Saved Route Set As Default Route (The route that appears when you open your browser for the first time)
SUMMARY
    0   TODAY'S ENGINEERING WORKS
  Engineering work starting on 12/02/10 between Nuneaton and Leicester.
Track improvements and maintenance are taking place from 23:15 on 12/02/10 to 01:00 on 15/02/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Leicester
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 08:46
  Engineering work starting on 13/02/10 between Bristol Parkway and Bristol Temple Meads.
Track improvements and maintenance are taking place from 22:00 on 13/02/10 to 10:00 on 14/02/10 between Bristol Parkway and Bristol Temple Meads.
Whilst work is taking place, buses will replace trains
between Bristol Parkway and Bristol Temple Meads
The 1605 Edinburgh - Bristol -Saturday- and the 0915 Bristol - Edinburgh -Sunday- will bne diverted and will not cal, at Bristol Parkway. More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 08:50
  Engineering work starting on 13/02/10 between Stafford and Stoke-On-Trent.
Track improvements and maintenance are taking place from 23:45 on 13/02/10 to 12:00 on 14/02/10 between Stafford and Stoke-On-Trent.
Whilst work is taking place, buses will replace trains
between Stafford and Stoke-On-Trent
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 08:53
  Engineering work starting on 15/02/10 between Derby and Nottingham.
Track improvements and maintenance are taking place from 00:05 on 15/02/10 to 05:00 on 20/02/10 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
The 2309 Birmingham to Nottingham will termiate at Derby. each weekday night More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 08:55
  Engineering work starting on 19/02/10 between Coleshill Parkway and Leicester.
Track improvements and maintenance are taking place from 23:15 on 19/02/10 to 01:00 on 22/02/10 between Coleshill Parkway and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Tamworth
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:33
  Engineering work starting on 20/02/10 between Banbury and Oxford.
Track improvements and maintenance are taking place from 02:00 on 20/02/10 to 05:00 on 22/02/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:31
  Engineering work starting on 21/02/10 between Leeds and York.
Track improvements and maintenance are taking place from 07:40 on 21/02/10 to 05:15 on 22/02/10 between Leeds and York.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:35
  Engineering work starting on 27/02/10 between Banbury and Oxford.
Track improvements and maintenance are taking place from 02:00 on 27/02/10 to 02:00 on 29/02/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:37
  Engineering work starting on 27/02/10 between Bristol Parkway and Bristol Temple Meads.
Track improvements and maintenance are taking place from 13:20 on 27/02/10 to 09:20 on 28/02/10 between Bristol Parkway and Bristol Temple Meads.
Whilst work is taking place, buses will replace trains
between Bristol Parkway and Bristol Parkway
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:40
  Engineering work starting on 28/02/10 between Cambridge and Stansted Airport.
Track improvements and maintenance are taking place from 02:00 on 28/02/10 to 21:00 on 25/02/10 between Cambridge and Stansted Airport.
Whilst work is taking place, buses will replace trains
between Cambridge and Stansted Airport
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:39
  Engineering work starting on 28/02/10 between Kirkcaldy and Dundee.
Track improvements and maintenance are taking place from 02:00 on 28/02/10 to 05:00 on 29/02/10 between Kirkcaldy and Dundee.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:41
  Engineering work starting on 28/02/10 between Leeds and York.
Track improvements and maintenance are taking place from 07:00 on 28/02/10 to 05:15 on 29/02/10 between Leeds and York.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :13/01/2010 09:41
  Engineering work starting on 05/03/10 between Nuneaton and Leicester.
Track improvements and maintenance are taking place from 23:15 on 05/03/10 to 01:00 on 08/03/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:02
  Engineering work starting on 06/03/10 between Exeter St Davids and Plymouth.
Track improvements and maintenance are taking place from 21:40 on 06/03/10 to 13:20 on 07/03/10 between Exeter St Davids and Plymouth.
Whilst work is taking place, buses will replace trains
between Tiverton Parkway and Plymouth
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:06
  Engineering work starting on 06/03/10 between Derby and Chesterfield.
Track improvements and maintenance are taking place from 23:30 on 06/03/10 to 11:00 on 07/03/10 between Derby and Chesterfield.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:10
  Engineering work starting on 06/03/10 between Banbury and Oxford.
Track improvements and maintenance are taking place from 23:45 on 06/03/10 to 02:00 on 08/03/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:06
  Engineering work starting on 07/03/10 between Kirkcaldy and Dundee.
Track improvements and maintenance are taking place from 00:50 on 07/03/10 to 05:00 on 08/03/10 between Kirkcaldy and Dundee.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:07
  Engineering work starting on 07/03/10 between Leeds and York.
Track improvements and maintenance are taking place from 07:40 on 07/03/10 to 05:15 on 08/03/10 between Leeds and York.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:07
  Engineering work starting on 12/03/10 between Nuneaton and Leicester.
Track improvements and maintenance are taking place from 23:15 on 12/03/10 to 02:00 on 15/03/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:12
  Engineering work starting on 13/03/10 between Exeter St Davids and Plymouth.
Track improvements and maintenance are taking place from 05:50 on 13/03/10 to 02:00 on 15/03/10 between Exeter St Davids and Plymouth.
Whilst work is taking place, buses will replace trains
between Tiverton Parkway and Plymouth via Exeter St Davids
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:14
  Engineering work starting on 13/03/10 between Banbury and Oxford.
Track improvements and maintenance are taking place from 23:45 on 13/03/10 to 02:00 on 15/03/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:13
  Engineering work starting on 14/03/10 between Leeds and York.
Track improvements and maintenance are taking place from 07:40 on 14/03/10 to 05:15 on 15/03/10 between Leeds and York.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:15
  Engineering work starting on 14/03/10 between Derby and Chesterfield.
Track improvements and maintenance are taking place from 23:30 on 14/03/10 to 11:00 on 14/03/10 between Derby and Chesterfield.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:16
  Engineering work starting on 19/03/10 between Nuneaton and Leicester.
Track improvements and maintenance are taking place from 23:15 on 19/03/10 to 02:00 on 22/03/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:17
  Engineering work starting on 20/03/10 between Exeter St Davids and Plymouth.
Track improvements and maintenance are taking place from 21:40 on 20/03/10 to 13:20 on 21/03/10 between Exeter St Davids and Plymouth.
Whilst work is taking place, buses will replace trains
between Tiverton Parkway and Plymouth via Exeter St Davids
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:20
  Engineering work starting on 20/03/10 between Derby and Chesterfield.
Track improvements and maintenance are taking place from 23:30 on 20/03/10 to 05:30 on 22/03/10 between Derby and Chesterfield.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:33
  Engineering work starting on 20/03/10 between Banbury and Oxford.
Track improvements and maintenance are taking place from 23:45 on 20/03/10 to 02:00 on 22/03/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:18
  Engineering work starting on 26/03/10 between Nuneaton and Leicester.
Track improvements and maintenance are taking place from 23:15 on 26/03/10 to 01:00 on 29/03/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:33
  Engineering work starting on 27/03/10 between Derby and Chesterfield.
Track improvements and maintenance are taking place from 23:00 on 27/03/10 to 12:00 on 28/03/10 between Derby and Chesterfield.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:38
  Engineering work starting on 27/03/10 between Exeter St Davids and Plymouth.
Track improvements and maintenance are taking place from 23:05 on 27/03/10 to 12:00 on 28/03/10 between Exeter St Davids and Plymouth.
Whilst work is taking place, buses will replace trains
between Tiverton Parkway and Plymouth via Exeter St Davids
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:38
  Engineering work starting on 27/03/10 between Birmingham New Street and Nuneaton.
Track improvements and maintenance are taking place from 23:15 on 27/03/10 to 04:10 on 29/03/10 between Birmingham New Street and Nuneaton.
Whilst work is taking place, buses will replace trains
between Water Orton and Coleshill Parkway
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:38
  Engineering work starting on 27/03/10 between Banbury and Oxford.
Track improvements and maintenance are taking place from 23:45 on 27/03/10 to 02:00 on 29/03/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:38
  Engineering work starting on 02/04/10 between Winchester and Southampton Central.
Track improvements and maintenance are taking place from 01:25 on 02/04/10 to 02:00 on 06/04/10 between Winchester and Southampton Central.
Whilst work is taking place, buses will replace trains
between Winchester and Southampton Central via Southampton Airport Parkwy
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :14/01/2010 11:39
  Engineering work starting on 02/04/10 between Basingstoke and Southampton Airport Parkwy.
Track improvements and maintenance are taking place from 02:00 on 02/04/10 to 04:00 on 06/04/10 between Basingstoke and Southampton Airport Parkwy.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Reading via Basingstoke
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:00
  Engineering work starting on 03/04/10 between Coventry and Birmingham International.
Track improvements and maintenance are taking place from 02:00 on 03/04/10 to 09:10 on 04/04/10 between Coventry and Birmingham International.
Whilst work is taking place, buses will replace trains
between Leamington Spa and Birmingham International via Coventry
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:04
  Engineering work starting on 03/04/10 between Glasgow Central and Motherwell.
Track improvements and maintenance are taking place from 20:20 on 03/04/10 to 02:00 on 05/04/10 between Glasgow Central and Motherwell.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:04
  Engineering work starting on 03/04/10 between Birmingham New Street and Gloucester.
Track improvements and maintenance are taking place from 23:00 on 03/04/10 to 03:45 on 05/04/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 15:58
  Engineering work starting on 04/04/10 between Stockport and Manchester Piccadilly.
Track improvements and maintenance are taking place from 02:00 on 04/04/10 to 04:00 on 05/04/10 between Stockport and Manchester Piccadilly.
Whilst work is taking place, buses will replace trains
between Stockport and Manchester Piccadilly
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:04
  Engineering work starting on 04/04/10 between Stansted Airport and Cambridge.
Track improvements and maintenance are taking place from 02:00 on 04/04/10 to 11:35 on 04/04/10 between Stansted Airport and Cambridge.
Whilst work is taking place, buses will replace trains
between Stansted Airport and Cambridge
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:05
  Engineering work starting on 10/04/10 between Southampton Airport Parkwy and Basingstoke.
Track improvements and maintenance are taking place from 02:00 on 10/04/10 to 04:00 on 12/04/10 between Southampton Airport Parkwy and Basingstoke.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Basingstoke via Winchester
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:46
  Engineering work starting on 10/04/10 between Motherwell and Edinburgh.
Track improvements and maintenance are taking place from 10:45 on 10/04/10 to 14:20 on 11/04/10 between Motherwell and Edinburgh.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:47
  Engineering work starting on 10/04/10 between Birmingham New Street and Gloucester.
Track improvements and maintenance are taking place from 23:00 on 10/04/10 to 04:00 on 12/04/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 16:37
  Engineering work starting on 17/04/10 between Southampton Airport Parkwy and Basingstoke.
Track improvements and maintenance are taking place from 01:25 on 17/04/10 to 04:00 on 19/04/10 between Southampton Airport Parkwy and Basingstoke.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Basingstoke via Winchester
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 17:35
  Engineering work starting on 17/04/10 between Motherwell and Edinburgh.
Track improvements and maintenance are taking place from 10:45 on 17/04/10 to 14:20 on 18/04/10 between Motherwell and Edinburgh.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 17:37
  Engineering work starting on 18/04/10 between Birmingham New Street and Gloucester.
Track improvements and maintenance are taking place from 23:00 on 18/04/10 to 03:45 on 19/04/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.

Hide Further Information
Message Received :17/01/2010 17:34
  Engineering work starting on 24/04/10 between Basingstoke and Southampton Airport Parkwy.
Track improvements and maintenance are taking place from 02:00 on 24/04/10 to 04:00 on 26/04/10 between Basingstoke and Southampton Airport Parkwy.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Basingstoke via Winchester
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :04/02/2010 16:36
  Engineering work starting on 24/04/10 between Birmingham Moor Street and Gloucester.
Track improvements and maintenance are taking place from 23:00 on 24/04/10 to 03:45 on 26/04/10 between Birmingham Moor Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :03/02/2010 15:48
  Engineering work starting on 25/04/10 between Tyseley and Birmingham New Street.
Track improvements and maintenance are taking place from 02:00 on 25/04/10 to 04:30 on 26/04/10 between Tyseley and Birmingham New Street.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :04/02/2010 16:39
  Engineering work starting on 25/04/10 between Stansted Airport and Cambridge.
Track improvements and maintenance are taking place from 02:00 on 25/04/10 to 04:20 on 26/04/10 between Stansted Airport and Cambridge.
Whilst work is taking place, buses will replace trains
between Stansted Airport and Cambridge
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :04/02/2010 16:40
  Engineering work starting on 01/05/10 between Birmingham International and Coventry.
Track improvements and maintenance are taking place from 02:00 on 01/05/10 to 05:25 on 03/05/10 between Birmingham International and Coventry.
Whilst work is taking place, buses will replace trains
between Leamington Spa and Birmingham International via Coventry
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 17:47
  Engineering work starting on 02/05/10 between Wakefield Westgate and Sheffield.
Track improvements and maintenance are taking place from 02:00 on 02/05/10 to 05:00 on 03/05/10 between Wakefield Westgate and Sheffield.
Whilst work is taking place, buses will replace trains
between Wakefield Kirkgate and Wakefield Westgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 17:48
  Engineering work starting on 02/05/10 between Southampton Airport Parkwy and Winchester.
Track improvements and maintenance are taking place from 02:00 on 02/05/10 to 01:30 on 03/05/10 between Southampton Airport Parkwy and Winchester.
Whilst work is taking place, buses will replace trains
between Basingstoke and Southampton Airport Parkwy via Winchester
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 17:49
  Engineering work starting on 02/05/10 between Glasgow Central and Motherwell.
Track improvements and maintenance are taking place from 02:00 on 02/05/10 to 04:30 on 03/05/10 between Glasgow Central and Motherwell.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 17:50
  Engineering work starting on 02/05/10 between Birmingham Moor Street and Gloucester.
Track improvements and maintenance are taking place from 23:00 on 02/05/10 to 03:45 on 04/05/10 between Birmingham Moor Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 17:43
  Engineering work starting on 08/05/10 between Reading and Guildford.
Track improvements and maintenance are taking place from 02:00 on 08/05/10 to 04:30 on 10/05/10 between Reading and Guildford.
Whilst work is taking place, buses will replace trains
between Reading and Guildford
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 18:38
  Engineering work starting on 08/05/10 between Birmingham New Street and Gloucester.
Track improvements and maintenance are taking place from 23:00 on 08/05/10 to 03:45 on 09/05/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 17:52
  Engineering work starting on 08/05/10 between Sheffield and Wakefield Westgate.
Track improvements and maintenance are taking place from 23:00 on 08/05/10 to 05:00 on 10/05/10 between Sheffield and Wakefield Westgate.
Whilst work is taking place, buses will replace trains
between Wakefield Kirkgate and Wakefield Westgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 18:42
  Engineering work starting on 09/05/10 between Birmingham New Street and Tyseley.
Track improvements and maintenance are taking place from 02:00 on 09/05/10 to 04:30 on 10/05/10 between Birmingham New Street and Tyseley.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 18:41
  Engineering work starting on 09/05/10 between Haymarket and Inverkeithing.
Track improvements and maintenance are taking place from 02:00 on 09/05/10 to 04:30 on 10/05/10 between Haymarket and Inverkeithing.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 18:44
  Engineering work starting on 09/05/10 between Glasgow Central and Motherwell.
Track improvements and maintenance are taking place from 02:00 on 09/05/10 to 04:30 on 10/05/10 between Glasgow Central and Motherwell.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 18:45
  Engineering work starting on 10/05/10 between Derby and Nottingham.
Track improvements and maintenance are taking place from 02:00 on 10/05/10 to 05:00 on 15/05/10 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
The 23:09 Birmingham to Nottingham Service ONLY will terminate at Derby each weekday night. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 18:49
  Engineering work starting on 15/05/10 between Reading and Guildford.
Track improvements and maintenance are taking place from 02:00 on 15/05/10 to 04:30 on 17/05/10 between Reading and Guildford.
Whilst work is taking place, buses will replace trains
between Reading and Guildford
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:01
  Engineering work starting on 15/05/10 between Birmingham New Street and Gloucester.
Track improvements and maintenance are taking place from 23:00 on 15/05/10 to 03:45 on 17/05/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 18:59
  Engineering work starting on 15/05/10 between Sheffield and Wakefield Westgate.
Track improvements and maintenance are taking place from 23:00 on 15/05/10 to 05:00 on 17/05/10 between Sheffield and Wakefield Westgate.
Whilst work is taking place, buses will replace trains
between Wakefield Kirkgate and Wakefield Westgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:02
  Engineering work starting on 16/05/10 between Haymarket and Inverkeithing.
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 04:30 on 17/05/10 between Haymarket and Inverkeithing.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:05
  Engineering work starting on 16/05/10 between Glasgow Central and Motherwell.
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 04:30 on 17/05/10 between Glasgow Central and Motherwell.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:18
  Engineering work starting on 16/05/10 between Oxford and Banbury.
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 11:30 on 16/05/10 between Oxford and Banbury.
Whilst work is taking place, buses will replace trains
between Oxford and Banbury
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:25
  Engineering work starting on 16/05/10 between Bournemouth and Brockenhurst.
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 09:05 on 16/05/10 between Bournemouth and Brockenhurst.
Whilst work is taking place, buses will replace trains
between Bournemouth and Southampton Central
The 09:40 Bournemouth - Manchester Piccadilly service will start from Southhampton central. As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:27
  Engineering work starting on 22/05/10 between Oxford and Banbury.
Track improvements and maintenance are taking place from 02:00 on 22/05/10 to 04:45 on 24/05/10 between Oxford and Banbury.
Whilst work is taking place, buses will replace trains
between Oxford and Banbury
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:35
  Engineering work starting on 22/05/10 between Edinburgh and Inverkeithing.
Track improvements and maintenance are taking place from 02:00 on 22/05/10 to 04:30 on 24/05/10 between Edinburgh and Inverkeithing.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:48
  Engineering work starting on 22/05/10 between Stafford and Stoke-On-Trent.
Track improvements and maintenance are taking place from 22:05 on 22/05/10 to 13:00 on 23/05/10 between Stafford and Stoke-On-Trent.
Whilst work is taking place, buses will replace trains
between Stafford and Macclesfield via Stoke-On-Trent
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:34
  Engineering work starting on 22/05/10 between Cheltenham Spa and Bristol Parkway.
Track improvements and maintenance are taking place from 23:20 on 22/05/10 to 04:30 on 24/05/10 between Cheltenham Spa and Bristol Parkway.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:34
  Engineering work starting on 23/05/10 between Derby and Nottingham.
Track improvements and maintenance are taking place from 02:00 on 23/05/10 to 16:00 on 23/05/10 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:43
  Engineering work starting on 29/05/10 between Stafford and Stoke-On-Trent.
Track improvements and maintenance are taking place from 22:05 on 29/05/10 to 05:15 on 31/05/10 between Stafford and Stoke-On-Trent.
Whilst work is taking place, buses will replace trains
between Stafford and Stoke-On-Trent
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:45
  Engineering work starting on 30/05/10 between Guildford and Reading.
Track improvements and maintenance are taking place from 02:00 on 30/05/10 to 16:15 on 30/05/10 between Guildford and Reading.
The 1214 Guildford to Newcastle service will start from Reading. As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:50
  Engineering work starting on 30/05/10 between Cheltenham Spa and Bristol Parkway.
Track improvements and maintenance are taking place from 23:25 on 30/05/10 to 04:30 on 01/06/10 between Cheltenham Spa and Bristol Parkway.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :08/02/2010 19:46
  Engineering work starting on 24/04/40 between Sheffield and Wakefield Westgate.
Track improvements and maintenance are taking place from 02:00 on 24/04/40 to 05:25 on 26/04/10 between Sheffield and Wakefield Westgate.
Whilst work is taking place, buses will replace trains
between Wakefield Westgate and Wakefield Kirkgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.

Hide Further Information
Message Received :04/02/2010 16:38
    0   LINE UPDATES
    0   SERVICE UPDATES
  Multiple Lines Partly Disrupted
METROPOLITAN LINE REVISION OF ENGINEERING WORKS: From Monday 8 February to Friday 19 February, planned engineering works affecting Monday to Friday services have now been revised. All trains to and from Aldgate will now stop at Baker Street in both directions.
This will affect journeys
from 09/02/2010 04:00 to 09/02/2010 23:59 .
Message Received : 08/02/2010 15:46
  Archway Station Closed
ARCHWAY STATION: Closed after 2200 each day from Sunday to Thursday, inclusive, from Monday 2 November until Thursday 27 May, inclusive.
This will affect journeys
from 09/02/2010 22:00 to 09/02/2010 23:59 ,
from 10/02/2010 00:00 to 10/02/2010 01:29 .
Message Received : 21/10/2009 08:19
  Blackfriars Station Closed
BLACKFRIARS UNDERGROUND STATION: Closed until late 2011. District and Circle line trains do not serve the station. Please bear this in mind if purchasing a season ticket or registering your Oystercards.
This will affect journeys
from 16/03/2009 01:30 to 01/11/2011 01:30 .
Message Received : 21/09/2009 04:27
  Clapham South Station Closed
CLAPHAM SOUTH STATION: Closed after 2200 each evening Sunday to Thursday, until Thursday 22 April.
This will affect journeys
from 09/02/2010 22:00 to 09/02/2010 23:59 ,
from 10/02/2010 00:00 to 10/02/2010 01:29 .
Message Received : 31/08/2009 10:15
  South Wimbledon Station Closed
SOUTH WIMBLEDON STATION: Closed after 2200 each day from Sunday to Thursday, inclusive, from Monday 4 January until Thursday 27 May, inclusive.
This will affect journeys
from 09/02/2010 22:00 to 09/02/2010 23:59 ,
from 10/02/2010 00:00 to 10/02/2010 01:29 .
Message Received : 03/11/2009 13:12
  Canary Wharf Station Information
CANARY WHARF STATION: Reduced escalator service until mid May 2010.
This will affect journeys
from 15/01/2010 13:20 to 16/05/2010 02:29 .
Message Received : 15/01/2010 13:20
  Greenford Station Information
GREENFORD STATION: Due to works taking place, the car park will be closed until the end of 2010.
This will affect journeys
from 17/06/2009 13:41 to 01/01/2011 01:29 .
Message Received : 17/06/2009 18:01
  Holland Park Station Information
HOLLAND PARK STATION: Reduced lift service until mid February 2010.
This will affect journeys
from 23/01/2009 01:30 to 15/02/2010 01:29 .
Message Received : 23/01/2010 05:41
  King's Cross St.Pancras Station Information
KING'S CROSS ST PANCRAS STATION: Reduced escalator service until mid February 2010.
This will affect journeys
from 23/01/2009 01:30 to 15/02/2010 01:29 .
Message Received : 23/01/2010 05:42
  Leicester Square Station Information
LEICESTER SQUARE STATION: Reduced escalator service until late April 2010.
This will affect journeys
from 23/01/2009 01:30 to 26/04/2010 02:29 .
Message Received : 23/01/2010 05:43
  London Bridge Station Information
LONDON BRIDGE UNDERGROUND STATION: Reduced escalator service until mid May 2010.
This will affect journeys
from 17/09/2009 11:52 to 17/05/2010 02:29 .
Message Received : 17/09/2009 11:52
  Multiple Stations Information
BANK / MONUMENT STATIONS: Reduced escalator service until further notice.
This will affect journeys
from 09/10/2009 10:12 to 04/04/2010 02:29 .
Message Received : 09/10/2009 10:12
  Oxford Circus Station Information
OXFORD CIRCUS: Until further notice, due to escalator work Central line passengers travelling to Oxford Street are strongly advised to avoid exiting at Oxford Circus station. Use Bond Street or Tottenham Court Road stations instead. Access to the Central line and interchange with the Bakerloo and Victoria lines is not affected.
This will affect journeys
from 13/09/2009 05:00 to 01/07/2010 02:29 .
Message Received : 23/01/2010 05:48
  Piccadilly Circus Station Information
PICCADILLY CIRCUS STATION: Reduced escalator service until further notice.
This will affect journeys
from 15/01/2010 13:20 to 16/05/2010 02:29 .
Message Received : 15/01/2010 13:23
  South Kensington Station Information
SOUTH KENSINGTON STATION: Reduced escalator service until mid February 2010.
This will affect journeys
from 15/01/2010 13:20 to 15/02/2010 01:29 .
Message Received : 15/01/2010 13:25
  Swiss Cottage Station Information
SWISS COTTAGE STATION: Reduced escalator service until late May 2010.
This will affect journeys
from 15/01/2010 13:20 to 01/06/2010 02:29 .
Message Received : 15/01/2010 13:27
  Warren Street Station Information
WARREN STREET STATION: Reduced escalator service until mid February 2010.
This will affect journeys
from 22/10/2009 14:11 to 15/02/2010 01:29 .
Message Received : 22/10/2009 14:11
  Waterloo Station Information
WATERLOO (UNDERGROUND) STATION: Reduced escalator service until late April 2010.
This will affect journeys
from 09/10/2009 09:43 to 26/04/2010 02:29 .