Track improvements and maintenance are taking place from 21:55 on 04/07/09 to 13:55 on 05/07/09 between Stafford and Stoke-On-Trent.
Whilst work is taking place, buses will replace trains
between Stafford and Stockport via Stoke-On-Trent
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 16:51
Track improvements and maintenance are taking place from 01:00 on 11/07/09 to 00:30 on 13/07/09 between Aberdeen and Aberdeen.
Whilst work is taking place, buses will replace trains
between Aberdeen and Aberdeen
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:51
Track improvements and maintenance are taking place from 21:55 on 11/07/09 to 13:55 on 12/07/09 between Stafford and Stoke-On-Trent.
Whilst work is taking place, buses will replace trains
between Stafford and Stockport via Stoke-On-Trent
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:46
Track improvements and maintenance are taking place from 00:45 on 12/07/09 to 04:45 on 13/07/09 between Stockport and Manchester Piccadilly.
Whilst work is taking place, buses will replace trains
between Wilmslow and Macclesfield
between Stafford and Stoke-On-Trent
between Wilmslow and Stockport
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:47
Track improvements and maintenance are taking place from 08:00 on 12/07/09 to 11:30 on 12/07/09 between Doncaster and Sheffield.
Whilst work is taking place, buses will replace trains
between Doncaster and Sheffield
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:51
Track improvements and maintenance are taking place from 04:45 on 18/07/09 to 05:30 on 20/07/09 between Coventry and Leamington Spa.
Whilst work is taking place, buses will replace trains
between Coventry and Leamington Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:55
Track improvements and maintenance are taking place from 22:30 on 18/07/09 to 05:20 on 20/07/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:52
Track improvements and maintenance are taking place from 11:20 on 19/07/09 to 22:00 on 19/07/09 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:55
Track improvements and maintenance are taking place from 22:30 on 24/07/09 to 05:20 on 27/07/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:55
Track improvements and maintenance are taking place from 22:55 on 25/07/09 to 05:30 on 27/07/09 between Coventry and Leamington Spa.
Whilst work is taking place, buses will replace trains
between Coventry and Leamington Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 18:58
Track improvements and maintenance are taking place from 11:20 on 26/07/09 to 22:00 on 26/07/09 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:01
Track improvements and maintenance are taking place from 22:30 on 31/07/09 to 05:20 on 03/08/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:07
Track improvements and maintenance are taking place from 23:20 on 01/08/09 to 04:30 on 03/08/09 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:08
Track improvements and maintenance are taking place from 00:01 on 02/08/09 to 00:01 on 03/08/09 between Leicester and Loughborough.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:07
Track improvements and maintenance are taking place from 22:30 on 07/08/09 to 05:20 on 10/08/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:08
Track improvements and maintenance are taking place from 00:01 on 08/08/09 to 05:25 on 08/09/09 between Burton-On-Trent and Derby.
The 0601 Sheffield to Reading service will start from Derby. Customers from Sheffield and Chesterfield are advised to travel onthe 0527 from Sheffield and change at Derby for onward connections. More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:12
Track improvements and maintenance are taking place from 22:40 on 10/08/09 to 05:10 on 13/08/09 between Basingstoke and Winchester.
The 1927 Manchester - Southampton Central Service will not call at Winchester EACH NIGHT. More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:14
Track improvements and maintenance are taking place from 22:30 on 14/08/09 to 05:20 on 17/08/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:15
Track improvements and maintenance are taking place from 22:35 on 19/08/09 to 05:30 on 21/09/09 between Birmingham New Street and Nuneaton.
Whilst work is taking place, buses will replace trains
between Birmingham International and Leicester
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:46
Track improvements and maintenance are taking place from 22:30 on 21/08/09 to 05:20 on 24/08/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:17
Track improvements and maintenance are taking place from 23:20 on 21/08/09 to 23:00 on 23/08/09 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:16
Track improvements and maintenance are taking place from 23:20 on 21/08/09 to 23:00 on 23/08/09 between Aberdeen and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:21
Track improvements and maintenance are taking place from 22:30 on 28/08/09 to 05:20 on 31/08/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:21
Track improvements and maintenance are taking place from 00:15 on 29/08/09 to 04:50 on 31/08/09 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:21
Track improvements and maintenance are taking place from 22:30 on 04/09/09 to 05:20 on 07/09/09 between Leicester and Peterborough.
Whilst work is taking place, buses will replace trains
between Leicester and Peterborough
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:25
Track improvements and maintenance are taking place from 21:00 on 05/09/09 to 13:00 on 06/09/09 between Didcot Parkway and Reading.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:26
Track improvements and maintenance are taking place from 00:01 on 06/09/09 to 04:00 on 08/09/09 between Basingstoke and Andover.
The 1718 Newcastle - Southampton Central Service will divert from Basingstoke to Winchester and run earlier into Southampton Central.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:32
Track improvements and maintenance are taking place from 11:20 on 06/09/09 to 22:30 on 06/09/09 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:27
Track improvements and maintenance are taking place from 01:25 on 12/09/09 to 04:25 on 14/09/09 between Stansted Airport and Audley End.
Whilst work is taking place, buses will replace trains
between Cambridge and Stansted Airport
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:40
Track improvements and maintenance are taking place from 22:35 on 12/09/09 to 05:30 on 14/09/09 between Birmingham New Street and Nuneaton.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:39
Track improvements and maintenance are taking place from 23:35 on 12/09/09 to 04:45 on 14/09/09 between Reading and Oxford.
Whilst work is taking place, buses will replace trains
between Oxford and Didcot Parkway
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:42
Track improvements and maintenance are taking place from 00:25 on 13/09/09 to 05:15 on 14/09/09 between Birmingham New Street and Cheltenham Spa.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:41
Track improvements and maintenance are taking place from 00:45 on 13/09/09 to 18:45 on 13/09/09 between Aberdeen and Aberdeen.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:46
Track improvements and maintenance are taking place from 00:01 on 19/09/09 to 05:25 on 19/09/09 between Burton-On-Trent and Derby.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:50
Track improvements and maintenance are taking place from 01:25 on 19/09/09 to 04:25 on 21/09/09 between Stansted Airport and Audley End.
Whilst work is taking place, buses will replace trains
between Stansted Airport and Cambridge
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:49
Track improvements and maintenance are taking place from 23:50 on 19/09/09 to 04:45 on 21/09/09 between Reading and Oxford.
Whilst work is taking place, buses will replace trains
between Inverkeithing and Didcot Parkway
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:49
Track improvements and maintenance are taking place from 00:25 on 20/09/09 to 05:15 on 21/09/09 between Birmingham New Street and Cheltenham Spa.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:49
Track improvements and maintenance are taking place from 23:10 on 25/09/09 to 01:15 on 28/09/09 between Basingstoke and Andover.
The 1718 Newcastle - Southampton Central will be diverted from Basingstoke to Winchester amd will run earlier into Southampton Central. More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:59
Track improvements and maintenance are taking place from 01:25 on 26/09/09 to 04:25 on 28/09/09 between Stansted Airport and Audley End.
Whilst work is taking place, buses will replace trains
between Stansted Airport and Cambridge
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:53
Track improvements and maintenance are taking place from 22:35 on 26/09/09 to 05:30 on 28/09/09 between Birmingham New Street and Nuneaton.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Leicester
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:51
Track improvements and maintenance are taking place from 00:25 on 27/09/09 to 05:15 on 28/09/09 between Birmingham New Street and Cheltenham Spa.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :23/06/2009 19:54
DISTRICT LINE: Saturday 4 and Sunday 5 July, suspended between Richmond and West Kensington and between Ealing Broadway and West Kensington. Rail replacment bus services operate.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 29/06/2009 07:40
JUBILEE LINE: Saturday 4 July, suspended between Green Park and Stratford. Two rail replacement bus services operate.
This will affect journeys
from 04/07/2009 01:30
to 05/07/2009 01:29
.
Message Received : 03/07/2009 11:49
METROPOLITAN LINE: Saturday 4 and Sunday 5 July, suspended between Rickmansworth and Amersham and between Rickmansworth and Chesham. A rail replacement bus service operates.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 29/06/2009 08:18
NORTHERN LINE: Saturday 4 and Sunday 5 July, suspended between Finchley Central and High Barnet. A rail replacement bus service operates.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 29/06/2009 10:07
PICCADILLY LINE: Saturday 4 and Sunday 5 July, suspended between Hammersmith and Northfields, between Hammersmith and Ealing Common and between Rayners Lane and Uxbridge. Rail replacement bus services operate.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 29/06/2009 10:28
KINGS CROSS ST PANCRAS STATION: Saturday 4 and Sunday 5 July, closed to Northern Line trains.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 18/05/2009 08:25
WANSTEAD STATION: Monday 22 June until Sunday 30 August, inclusive, closed.
This will affect journeys
from 22/06/2009 01:30
to 31/08/2009 01:29
.
Message Received : 21/06/2009 18:40
WARREN STREET STATION: Saturday 4 and Sunday 5 July, closed.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 30/03/2009 14:37
WOOD GREEN STATION: Saturday 4 and Sunday 5 July, closed.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 13/04/2009 08:56
BLACKFRIARS UNDERGROUND STATION: Until late 2011, Network Rail is carrying out major improvements to the Underground station as part of the Thameslink Upgrade programme. District and Circle line trains will not stop at the station during this time.
This will affect journeys
from 16/03/2009 00:30
to 01/11/2011 00:30
.
Message Received : 30/04/2009 13:07
BRIXTON STATION: No step free access to the platforms due to essential maintenance.
This will affect journeys
from 02/07/2009 05:24
to 06/07/2009 05:29
.
Message Received : 02/07/2009 15:18
CIRCLE LINE: Saturday 4 and Sunday 5 July, there is no through Circle line service. Passengers travelling between Bayswater and Baker Street in either direction will need to change trains at Edgware Road.
This will affect journeys
from 04/07/2009 01:30
to 06/07/2009 01:29
.
Message Received : 24/06/2009 11:38
FINSBURY PARK STATION: Ticket office is closed from Monday 29 June until Friday 17 July due to station refurbishment work.
This will affect journeys
from 29/06/2009 04:00
to 18/07/2009 01:29
.
Message Received : 29/06/2009 14:53
GOODGE STREET STATION: Reduced lift service after 2200 in the evening until mid August 2009.
This will affect journeys
from 04/07/2009 00:00
to 04/07/2009 01:29
.
Message Received : 08/05/2009 11:42
GREENFORD STATION: Due to station upgrade works to provide step-free access, the car park will be closed until the end of 2010.
This will affect journeys
from 17/06/2009 12:41
to 01/01/2011 00:29
.
Message Received : 17/06/2009 17:01
HEATHROW TERMINALS 123 STATION: A reduced escalator service until late August 2009.
This will affect journeys
from 11/05/2008 01:29
to 31/08/2009 23:59
.
Message Received : 08/05/2009 11:43
KINGS CROSS ST PANCRAS: No step free access to the Piccadilly, Victoria and Northern line ticket hall due to a faulty lift.
This will affect journeys
from 03/07/2009 16:56
to 04/07/2009 01:29
.
Message Received : 03/07/2009 17:07
MONUMENT AND BANK STATIONS: Please avoid using Monument Station to interchange with services from Bank. Until summer 2009 interchange between District and Circle line services at Monument and all services from Bank station is only available at street level due to escalator refurbishment works. As an alternative use nearby Mansion House or Cannon Street stations which are a short walk from Bank. Maps of the area are available at both stations. Local bus services 21 43 133 and 141 also operate between London Bridge and Moorgate stations calling at Bank and Monument.
This will affect journeys
from 31/03/2008 04:30
to 01/09/2009 01:30
.
Message Received : 19/06/2009 14:05
MONUMENT AND BANK STATIONS: Please avoid using Monument Station to interchange with services from Bank. Until summer 2009 interchange between District and Circle line services at Monument and all services from Bank station is only available at street level due to escalator refurbishment works. As an alternative use nearby Mansion House or Cannon Street stations which are a short walk from Bank. Maps of the area are available at both stations. Local bus services 21 43 133 and 141 also operate between London Bridge and Moorgate stations calling at Bank and Monument.
This will affect journeys
from 31/03/2008 01:30
to 01/09/2009 01:30
.
Message Received : 17/04/2009 14:59
PICCADILLY CIRCUS STATION: Reduced escalator service until further notice.
This will affect journeys
from 11/05/2009 01:29
to 31/03/2010 01:29
.
Message Received : 08/05/2009 11:43
PIMLICO STATION: Reduced escalator service until September.
This will affect journeys
from 02/07/2009 16:24
to 01/10/2009 01:29
.
Message Received : 02/07/2009 16:25
SWISS COTTAGE STATION: No down escalator until September 2009.
This will affect journeys
from 18/08/2008 04:30
to 30/09/2009 01:30
.
Message Received : 30/04/2009 13:12