Engineering work

Live service info

Timetables

 

Station info

 

You are here: Home > Your journey > Live running information

Southeastern live running information

@se_railway on twitter
Live running information for all journeys
0 Line updates
There are currently no Line updates reported.
0 Catering updates
There are currently no Catering updates reported.
0 Train formation updates
There are currently no Train formation updates reported.
0 Train cancellations
There are currently no Train cancellations reported.
5 Other train service updates
This train will be starting late from Hayes Kent.
This is due to signalling problems.
Last Updated :18/04/2014 08:29
Scheduled Expected Destination
08:32 08:32 Hayes Kent
08:35 08:35 West Wickham
08:37 08:37 Eden Park
08:41 08:41 Elmers End
08:43 08:43 Clock House
08:45 08:45 New Beckenham
08:47 08:47 Lower Sydenham
08:50 08:50 Catford Bridge
08:52 08:52 Ladywell
08:57 08:57 Lewisham
08:59 08:59 St Johns
09:01 09:01 New Cross
09:08 09:08 London Bridge
09:12 09:12 London Cannon Street

This train will be terminated at Elmers End.
This train will no longer call at Eden Park, West Wickham and Hayes Kent.
This is due to signalling problems.
Last Updated :18/04/2014 08:37
Scheduled Expected Destination
08:39 08:39 London Cannon Street
08:43 08:43 London Bridge
08:48 08:48 New Cross
08:50 08:50 St Johns
08:54 08:54 Lewisham
08:57 08:57 Ladywell
08:59 08:59 Catford Bridge
09:02 09:02 Lower Sydenham
09:04 09:04 New Beckenham
09:06 09:06 Clock House
09:09 09:09 Elmers End
09:12 Not Stopping Eden Park
09:15 Not Stopping West Wickham
09:19 Not Stopping Hayes Kent

This train will be terminated at Elmers End.
This train will no longer call at Eden Park, West Wickham and Hayes Kent.
This is due to signalling problems.
Last Updated :18/04/2014 08:36
Scheduled Expected Destination
08:44 08:44 London Charing Cross
08:47 08:47 London Waterloo East
08:53 08:53 London Bridge
09:04 09:04 Ladywell
09:06 09:06 Catford Bridge
09:09 09:09 Lower Sydenham
09:11 09:11 New Beckenham
09:13 09:13 Clock House
09:16 09:16 Elmers End
09:19 Not Stopping Eden Park
09:22 Not Stopping West Wickham
09:26 Not Stopping Hayes Kent

This train will be started from Clock House.
This train will no longer call at Hayes Kent, West Wickham, Eden Park and Elmers End.
This is due to signalling problems.
Last Updated :18/04/2014 08:36
Scheduled Expected Destination
09:02 Not Stopping Hayes Kent
09:05 Not Stopping West Wickham
09:07 Not Stopping Eden Park
09:11 Not Stopping Elmers End
09:13 09:13 Clock House
09:15 09:15 New Beckenham
09:17 09:17 Lower Sydenham
09:20 09:20 Catford Bridge
09:22 09:22 Ladywell
09:27 09:27 Lewisham
09:29 09:29 St Johns
09:31 09:31 New Cross
09:38 09:38 London Bridge
09:42 09:42 London Cannon Street

This train will be started from Clock House.
This train will no longer call at Hayes Kent, West Wickham, Eden Park and Elmers End.
This is due to signalling problems.
Last Updated :18/04/2014 08:39
Scheduled Expected Destination
09:32 Not Stopping Hayes Kent
09:35 Not Stopping West Wickham
09:37 Not Stopping Eden Park
09:41 Not Stopping Elmers End
09:43 09:43 Clock House
09:45 09:45 New Beckenham
09:47 09:47 Lower Sydenham
09:50 09:50 Catford Bridge
09:52 09:52 Ladywell
09:57 09:57 Lewisham
09:59 09:59 St Johns
10:01 10:01 New Cross
10:08 10:08 London Bridge
10:12 10:12 London Cannon Street

1 London underground update
London Underground Updates in for
East Ham Station Information
East Ham: No Step Free Access - Step free access is not available to the Eastbound platform while we fix a faulty lift. Call our Travel Information Centre on 0843 222 1234 if you need help planning your journey.
This Information will apply from 18/04/2014 08:52 to 19/04/2014 01:29.
This will affect journeys
from 18/04/2014 08:52 to 19/04/2014 01:29.
Affected Stations:
East Ham.
Last Updated: 08:53:59 18/04/2014
Underground updates supplied by TFL Travel Information. Click here for the TfL Journey Planner.
5 Station updates
At East Malling station.
The permit to travel machine is not accepting coins
Last Updated :13/04/2014 06:30
At Gillingham Kent station.
The lifts will be out of order between Platforms 1 and 2 from 15/04/2014 21:21 until further notice.
Last Updated :15/04/2014 21:21
At Longfield station.
The permit to travel machine is out of order.
Last Updated :16/04/2014 19:25
At Strood station.
The ticket vending machines are out of order.
Last Updated :18/04/2014 06:59
At West St Leonards station.
The permit to travel machine is out of order.
Last Updated :16/04/2014 18:19
6 Engineering works For Today
Planned engineering work will take place
Between London Charing Cross and London Bridge
From 0200, Friday 18 April 2014 to 0330, Monday 21 April 2014.
Additional Information:
There are no train services operating between London Bridge, London Waterloo East and London Charing Cross. As a result, train services will operate as scheduled (with the exception of Saturday 19 April), to and from Southeast London, Kent and London Bridge and are diverted to operate from London Cannon Street.
.
Passengers for London Charing Cross and London Waterloo Ease can use London Underground services from London Bridge and London Cannon Street. Valid train tickets will be accepted for travel, in either direction and by any reasonable route, between London Bridge, Cannon Street, Southwark (for London Waterloo East), Waterloo, Embankment (for London Charing Cross) and Charing Cross underground stations.
.
IMPORTANT EXCEPTION FOR SATURDAY 19 APRIL. All Metro train services to and from London Bridge will operate to a revised timetable FROM ALL STATIONS,
Last Updated :27/03/2014 08:49
Planned engineering work will take place
Between Sole Street and Gillingham Kent
From 0200, Friday 18 April 2014 to 0330, Tuesday 22 April 2014.
All services will be replaced by buses between Meopham and Gillingham Kent.
Customer Advice:
There are no train services calling at Rochester or Chatham.
However, there are replacement bus services, calling at these two stations, operating in each direction between Meopham and Gillingham.
.
Furthermore, London Victoria/Ramsgate/Dover Priory services will operate between London Victoria, Bromley South and Maidstone East in order to connect with a replacement bus services operating between Maidstone East and Gillingham. These replacement bus services connect at Gillingham with Ramsgate and Dover Priory via Faversham services.
Last Updated :27/03/2014 08:54
Planned engineering work will take place
Between Strood and Gillingham Kent
From 0200, Friday 18 April 2014 to 0330, Tuesday 22 April 2014.
All lines are affected.
All services will be replaced by buses between Strood and Gillingham Kent.
Additional Information:
There are no train services calling at Rochester or Chatham. However, there are replacement bus services, calling at these two stations, operating in each direction between Strood and Gillingham.
.
This engineering work will affect London Bridge/Gillingham Metro services, and St Pancras International/Faversham High Speed services.
Last Updated :27/03/2014 09:05
Planned engineering work will take place
Between Strood and Maidstone West
From 0200, Friday 18 April 2014 to 0330, Tuesday 22 April 2014.
All lines are affected.
Additional Information:
As a result of engineering work between Strood and Gillingham, there is a reduction in the frequency of train services operating between, Strood, Cuxton, Halling, Snodland, New Hythe, Aylesford and, Maidstone Barracks. However, there is an hourly High Speed service operating non-stop, in both directions, between Strood and Maidstone West.
Last Updated :27/03/2014 09:15
Planned engineering work will take place
Between Denmark Hill and Shortlands via Catford
From 0200, Friday 18 April 2014 to 0330, Tuesday 22 April 2014.
All lines are affected.
All services will be replaced by buses between Herne Hill and Beckenham Junction.
Additional Information:
There are no train services calling at (in alphabetical order) Beckenham Hill, Bellingham, Catford, Crofton Park, Denmark Hill, Nunhead, Peckham Rye or Ravensbourne.
However, there are replacement bus services, calling at these stations (with the exception of Nunhead), operating in each direction between Herne Hill and Beckenham Junction, with a mini bus service between Ravensbourne and Beckenham Junction. Passengers for Nunhead should use local bus route P12 between Peckham Rye and Nunhead.
.
Please note: London Blackfriars/Sevenoaks services are diverted between Elephant & Castle and Shortlands and will call additionally at Herne Hill and Beckenham Junction to connect with replacement bus services
.
IMPORTANT EXCEPTIONS FOR SATURDAY 19 APRIL. There are no train services operating between Nunhead and Lewisham. Passengers planning to make this journey should use local bus route 484. Passengers travelling to and from Ravensbourne should use local bus route 354.
Valid train tickets will be accepted on all of the local bus routes listed above between affected stations.
Last Updated :27/03/2014 09:22
Planned engineering work will take place
Between Sittingbourne and Sheerness-On-Sea
From 0200, Saturday 19 April 2014 to 0330, Sunday 20 April 2014.
Additional Information:
As a result of engineering work between Sole Street and Gillingham, Sittingbourne/Sheerness-on-Sea train services will operate to a revised timetable and will run 2 (two) minutes EARLIER than scheduled.
Last Updated :27/03/2014 09:17
Live departures
Load a route using the "Your Journey" selection boxes above.
 
Specify a "From" station to see live train departure times for that station.
 
Additionally specify a "To" station to see real time departure information for only the services that go on to call at your "To" station.
 

Live arrivals
Load a route using the "Your Journey" selection boxes above.
 
Specify a "To" station to see live train arrival times for that station.
 
Additionally specify a "From" station to see real time arrival information for only the services that call at that station prior to your "To" station.
 

Last Updated On: 09:02:02 18-04-2014
Powered By     © 2014