Track improvements and maintenance are taking place from 13/02/10 to 02:00 on 15/02/10 between Woking and Basingstoke.
Whilst work is taking place, buses will replace trains
between Woking and Basingstoke
Engineering work between Woking and Basingstoke on Saturday 13 and Sunday 14 February 2010
Buses replace trains between Woking and Basingstoke.
A reduced level of service will run between London Waterloo and Weymouth and these trains will be diverted from Woking to Southampton Central.
Journey times may be extended by up to an hour.
Some trains will start / terminate at Basingstoke. Passengers from London Waterloo and Clapham Junction should use Alton services as far as Woking and change there for connecting buses to Basingstoke. Passengers will need to leave at least an hour earlier to maintain connections.
A reduced level of service will run between London Waterloo and Woking. Additional buses will operate between Woking, Farnborough and Fleet.
Passengers from London Waterloo and Clapham Junction will need to travel on Portsmouth Harbour services to Woking, 45 minutes earlier to maintain connections
01:05 London Waterloo to Southampton Central bus replaces train between Woking and Southampton Central
Parts of the railway may be closed for overnight engineering work or emergency repairs. We may then have to alter some late evening and early morning trains or replace them by buses at short notice. Please check your journey details for late alterations if you intend to travel after 2300 or before 0530.
We are sorry that cycles, prams and items of bulky luggage cannot be carried on buses or taxis provided to replace train services during engineering work.
Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from National Rail Enquiries on 08457 48 49 50.
Message Received :07/02/2010 20:55
Track improvements and maintenance are taking place from 22:00 on 13/02/10 to 02:00 on 15/02/10 between Fratton and Portsmouth Harbour.
Engineering work between Fratton and Portsmouth Harbour from 22:00 on Saturday 13 and all day Sunday 14 February 2010
Buses replace trains between Fratton and Portsmouth Harbour. Passengers from Portsmouth will have to leave 20 minutes earlier to maintain connections at Fratton
Parts of the railway may be closed for overnight engineering work or emergency repairs. We may then have to alter some late evening and early morning trains or replace them by buses at short notice. Please check your journey details for late alterations if you intend to travel after 2300 or before 0530.
We are sorry that cycles, prams and items of bulky luggage cannot be carried on buses or taxis provided to replace train services during engineering work.
Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from National Rail Enquiries on 08457 48 49 50.
Message Received :07/02/2010 20:53
Track improvements and maintenance are taking place from 14/02/10 to 02:00 on 15/02/10 between Ewell West and Dorking.
Whilst work is taking place, buses will replace trains
between Ewell West and Dorking
between Ewell West and Effingham Junction
Engineering work between Ewell East and Dorking on Sunday 14 February 2010
Southern
Buses replace trains between Sutton and Dorking
South West Trains
Buses replace trains between Ewell West and Dorking / Effingham Junction
Journey times may be extended by 45 minutes
Passengers from Guildford and Dorking will have to leave earlier to maintain connection.
Parts of the railway may be closed for overnight engineering work or emergency repairs. We may then have to alter some late evening and early morning trains or replace them by buses at short notice. Please check your journey details for late alterations if you intend to travel after 2300 or before 0530.
We are sorry that cycles, prams and items of bulky luggage cannot be carried on buses or taxis provided to replace train services during engineering work.
Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from National Rail Enquiries on 08457 48 49 50.
Message Received :07/02/2010 20:59
Monday to Thursday
21:20 London Waterloo to Yeovil Junction will be replaced by a bus between Salisbury and Yeovil Junction
22:57 Exeter St Davids to Salisbury will be delayed between Yeovil Junction and Salisbury, arriving at 01:17
23:05 London Waterloo to Poole will be replaced by a bus between Southampton Central and Poole
23:45 London Waterloo to Portsmouth & Southsea will be replaced by a bus between Havant and Portsmouth & Southsea
Tuesday to Friday
00:05 London Waterloo to Bournemouth will be replaced by a bus between Southampton Central and Bournemouth
00:09 London Waterloo to Guildford will be replaced by a bus between Woking and Guildford
00:30 Eastleigh to Portsmouth Harbour bus replaces train throughout, calling at all stations (set down only)
01:05 London Waterloo to Southampton Central will not stop at Wimbledon or Surbiton, buses will run from London Waterloo to Surbiton and Wimbledon, and Surbiton to Woking, bus replaces train between Basingstoke and Southampton Central
04:00 Guildford to London Waterloo will not stop at Woking, a bus will run Guildford (03:25), Woking (03:45), Surbiton (04:15) to connect with train
04:40 Havant to Portsmouth Harbour will be replaced by a bus between Havant (04:16) and Fratton, train starts from Fratton at 04:52
Parts of the railway may be closed for overnight engineering work or emergency repairs. We may then have to alter some late evening and early morning trains or replace them by buses at short notice. Please check your journey details for late alterations if you intend to travel after 2300 or before 0530.
We are sorry that cycles, prams and items of bulky luggage cannot be carried on buses or taxis provided to replace train services during engineering work.
Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from National Rail Enquiries on 08457 48 49 50.
Message Received :08/02/2010 05:33
This train will be formed of 4 coaches instead of 8.
This is due to a train fault.
Message Received :09/02/2010 04:13
This train will be formed of 9 coaches instead of 10.
This is due to a train fault.
Message Received :09/02/2010 04:13
This train will be formed of 8 coaches instead of 12.
This is due to a train fault.
Message Received :09/02/2010 04:13
This train will be formed of 8 coaches instead of 12.
This is due to a train fault.
Message Received :09/02/2010 04:15
METROPOLITAN LINE REVISION OF ENGINEERING WORKS: From Monday 8 February to Friday 19 February, planned engineering works affecting Monday to Friday services have now been revised. All trains to and from Aldgate will now stop at Baker Street in both directions.
This will affect journeys
from 09/02/2010 04:00
to 09/02/2010 23:59
.
Message Received : 08/02/2010 15:46
ARCHWAY STATION: Closed after 2200 each day from Sunday to Thursday, inclusive, from Monday 2 November until Thursday 27 May, inclusive.
This will affect journeys
from 09/02/2010 22:00
to 09/02/2010 23:59
,
from 10/02/2010 00:00
to 10/02/2010 01:29
.
Message Received : 21/10/2009 08:19
BLACKFRIARS UNDERGROUND STATION: Closed until late 2011. District and Circle line trains do not serve the station. Please bear this in mind if purchasing a season ticket or registering your Oystercards.
This will affect journeys
from 16/03/2009 01:30
to 01/11/2011 01:30
.
Message Received : 21/09/2009 04:27
CLAPHAM SOUTH STATION: Closed after 2200 each evening Sunday to Thursday, until Thursday 22 April.
This will affect journeys
from 09/02/2010 22:00
to 09/02/2010 23:59
,
from 10/02/2010 00:00
to 10/02/2010 01:29
.
Message Received : 31/08/2009 10:15
SOUTH WIMBLEDON STATION: Closed after 2200 each day from Sunday to Thursday, inclusive, from Monday 4 January until Thursday 27 May, inclusive.
This will affect journeys
from 09/02/2010 22:00
to 09/02/2010 23:59
,
from 10/02/2010 00:00
to 10/02/2010 01:29
.
Message Received : 03/11/2009 13:12
CANARY WHARF STATION: Reduced escalator service until mid May 2010.
This will affect journeys
from 15/01/2010 13:20
to 16/05/2010 02:29
.
Message Received : 15/01/2010 13:20
GREENFORD STATION: Due to works taking place, the car park will be closed until the end of 2010.
This will affect journeys
from 17/06/2009 13:41
to 01/01/2011 01:29
.
Message Received : 17/06/2009 18:01
HOLLAND PARK STATION: Reduced lift service until mid February 2010.
This will affect journeys
from 23/01/2009 01:30
to 15/02/2010 01:29
.
Message Received : 23/01/2010 05:41
KING'S CROSS ST PANCRAS STATION: Reduced escalator service until mid February 2010.
This will affect journeys
from 23/01/2009 01:30
to 15/02/2010 01:29
.
Message Received : 23/01/2010 05:42
LEICESTER SQUARE STATION: Reduced escalator service until late April 2010.
This will affect journeys
from 23/01/2009 01:30
to 26/04/2010 02:29
.
Message Received : 23/01/2010 05:43
LONDON BRIDGE UNDERGROUND STATION: Reduced escalator service until mid May 2010.
This will affect journeys
from 17/09/2009 11:52
to 17/05/2010 02:29
.
Message Received : 17/09/2009 11:52
BANK / MONUMENT STATIONS: Reduced escalator service until further notice.
This will affect journeys
from 09/10/2009 10:12
to 04/04/2010 02:29
.
Message Received : 09/10/2009 10:12
OXFORD CIRCUS: Until further notice, due to escalator work Central line passengers travelling to Oxford Street are strongly advised to avoid exiting at Oxford Circus station. Use Bond Street or Tottenham Court Road stations instead. Access to the Central line and interchange with the Bakerloo and Victoria lines is not affected.
This will affect journeys
from 13/09/2009 05:00
to 01/07/2010 02:29
.
Message Received : 23/01/2010 05:48
PICCADILLY CIRCUS STATION: Reduced escalator service until further notice.
This will affect journeys
from 15/01/2010 13:20
to 16/05/2010 02:29
.
Message Received : 15/01/2010 13:23
SOUTH KENSINGTON STATION: Reduced escalator service until mid February 2010.
This will affect journeys
from 15/01/2010 13:20
to 15/02/2010 01:29
.
Message Received : 15/01/2010 13:25
SWISS COTTAGE STATION: Reduced escalator service until late May 2010.
This will affect journeys
from 15/01/2010 13:20
to 01/06/2010 02:29
.
Message Received : 15/01/2010 13:27
WARREN STREET STATION: Reduced escalator service until mid February 2010.
This will affect journeys
from 22/10/2009 14:11
to 15/02/2010 01:29
.
Message Received : 22/10/2009 14:11
WATERLOO (UNDERGROUND) STATION: Reduced escalator service until late April 2010.
This will affect journeys
from 09/10/2009 09:43
to 26/04/2010 02:29
.
Message Received : 09/10/2009 09:43