Planned engineering work will take place between London Paddington and Ealing Broadway/Slough/Reading from 23:45, Saturday 18 May 2024 to 07:45, Sunday 19 May 2024.
Some lines will be blocked.
Additional Facilities Information
Additional Information
On Saturday 18 May
The 2345 Didcot Parkway to London Paddington will terminate at Ealing Broadway at 0105. TfL Central line connections will be available from Ealing Broadway towards central London*
On Sunday 19 May
The 0638 London Paddington to Reading will start from Ealing Broadway at 0649. TfL Central line connections will be available from central London*
The 0620 Reading to London Paddington will depart at 0636 and run later throughout
* - the nearest Central line Tube station to London Paddington is Lancaster Gate, approximately 8-10 minutes walk from London Paddington
Last Updated: 02/05/2024 13:42